Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Elmo Bumpy Torus proof of principle, Phase II: Title 1 report. Volume IX. Support structure

Technical Report ·
DOI:https://doi.org/10.2172/6691654· OSTI ID:6691654
The EBT-P support structure provides structural support for the 36 mirror coil magnets, magnet protection system, the toroidal vessel, and much of the device ancillary equipment. The structure is comprised of a primary support and a superstructure. The primary support is a reinforced concrete ring located directly inboard of the torus and is supported by nine columns. The toroidal vessel and the mirror coil magnets are cantilevered from the ring with the centerline of the torus located eight feet above the floor. The superstructure is an aluminum truss structure that rests on the concrete ring. The superstructure provides support for the device ancillary equipment. Engineering drawings of the support structure are given.
Research Organization:
McDonnell Douglas Astronautics Co., St. Louis, MO (USA)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
6691654
Report Number(s):
ORNL/Sub-81-21099/1-09; ON: DE83001502
Country of Publication:
United States
Language:
English

Similar Records

ELMO Bumpy Square proposal
Technical Report · Wed Oct 01 00:00:00 EDT 1986 · OSTI ID:7231423

Magnetics calculations for an ELMO Bumpy Square
Technical Report · Thu Feb 28 23:00:00 EST 1985 · OSTI ID:5726293

Magnetics calculations for an ELMO Bumpy Square
Conference · Mon Jul 01 00:00:00 EDT 1985 · Fusion Technol.; (United States) · OSTI ID:5793698