Usable hydro capacity and electric utility production simulation and reliability calculations
Journal Article
·
· IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (USA)
- Pacific Gas and Electric Co., San Francisco, CA (USA)
Hydroelectric plants are modeled in equivalent load duration curve (ELDC) based production simulation and reliability models in two ways: through peakshaving and by dispatching the hydro plants against the ELDC. This paper compares the two methods with respect to the implied usability of the hydro capacity. Tests results indicate that the peakshaving approach is more appropriate, according to this comparison criterion.
- OSTI ID:
- 6681279
- Journal Information:
- IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (USA), Journal Name: IEEE Transactions on Power Systems (Institute of Electrical and Electronics Engineers); (USA) Vol. 5:2; ISSN 0885-8950; ISSN ITPSE
- Country of Publication:
- United States
- Language:
- English
Similar Records
A new method for stochastic production simulation in generation system with multiple hydro units
Reliability and economy -- Hydro electricity for Iran
Electric energy generation: economics, reliability, and rates
Journal Article
·
Wed Jun 01 00:00:00 EDT 1988
· IEEE Trans. Energy Conver.; (United States)
·
OSTI ID:6943929
Reliability and economy -- Hydro electricity for Iran
Conference
·
Wed Dec 30 23:00:00 EST 1998
·
OSTI ID:320899
Electric energy generation: economics, reliability, and rates
Book
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6804277