Canton hydroelectric project: feasibility study. Final report
The Canton Hydroelectric Project study was undertaken to determine the feasibility of redeveloping hydroelectric power generation facilities at the Upper and Lower Dams on the Farmington River at Collinsville, CT. The integrity of the existing dams and power plants was investigated and found to be generally adequate. The intake channels, powerhouses and tailraces will require refurbishing but no major repairs. The Lower Dam will require some repair to correct surface deterioration conditions. New flashboard installations are contemplated for both the dams. Energy production operational studies were performed on 25 generating unit alternatives for the two sites. Detailed cost estimates were prepared for seven Upper and five Lower site alternatives, and a detailed economic analysis of ten project alternatives was performed. The economic analysis included 3 power marketing options and the future escalation of the value of energy. The conclusions of this study were: the project is economically feasible on a 40-y life cycle basis; short-term financing, bond payment adjustments, or other special financial arrangements will be needed to provide for the negative cash flow during the early years of operation; and the Town of Canton should further pursue the power marketing and financing aspects of the project. (LCL)
- Research Organization:
- Development and Resources Corp., Sacramento, CA (USA)
- DOE Contract Number:
- FC07-78ID01818
- OSTI ID:
- 6661405
- Report Number(s):
- DOE/ID/01818-T1(Vol.1)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Canton hydroelectric project: feasibility study. Final report, appendices
Feasibility of determination of low-head hydroelectric power development at existing sites. Dan River hydroelectric development. Feasibility report
Piqua Hydroelectric Project. Feasibility assessment report
Technical Report
·
Tue May 01 00:00:00 EDT 1979
·
OSTI ID:6661359
Feasibility of determination of low-head hydroelectric power development at existing sites. Dan River hydroelectric development. Feasibility report
Technical Report
·
Sat Mar 31 23:00:00 EST 1979
·
OSTI ID:5746953
Piqua Hydroelectric Project. Feasibility assessment report
Technical Report
·
Wed Feb 28 23:00:00 EST 1979
·
OSTI ID:5931190
Related Subjects
13 HYDRO ENERGY
130300* -- Hydro Energy-- Plant Design & Operation
COMPARATIVE EVALUATIONS
CONNECTICUT
DAMS
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC POWER
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
LEGAL ASPECTS
MARKET
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER GENERATION
POWER PLANTS
RETROFITTING
SAFETY
SOCIO-ECONOMIC FACTORS
SURFACE WATERS
USA
WATER RESERVOIRS
130300* -- Hydro Energy-- Plant Design & Operation
COMPARATIVE EVALUATIONS
CONNECTICUT
DAMS
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC POWER
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
HYDROELECTRIC POWER PLANTS
INSTITUTIONAL FACTORS
LEGAL ASPECTS
MARKET
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER GENERATION
POWER PLANTS
RETROFITTING
SAFETY
SOCIO-ECONOMIC FACTORS
SURFACE WATERS
USA
WATER RESERVOIRS