Canton hydroelectric project: feasibility study. Final report, appendices
These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
- Research Organization:
- Development and Resources Corp., Sacramento, CA (USA)
- DOE Contract Number:
- FC07-78ID01818
- OSTI ID:
- 6661359
- Report Number(s):
- DOE/ID/01818-T1(Vol.2)
- Country of Publication:
- United States
- Language:
- English
Similar Records
Canton hydroelectric project: feasibility study. Final report
Feasibility of determination of low-head hydroelectric power development at existing sites. Dan River hydroelectric development. Feasibility report
Normanskill Hydroelectric Facility Feasibility Assessment
Technical Report
·
Fri Jun 01 00:00:00 EDT 1979
·
OSTI ID:6661405
Feasibility of determination of low-head hydroelectric power development at existing sites. Dan River hydroelectric development. Feasibility report
Technical Report
·
Sat Mar 31 23:00:00 EST 1979
·
OSTI ID:5746953
Normanskill Hydroelectric Facility Feasibility Assessment
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:5690899
Related Subjects
13 HYDRO ENERGY
130300* -- Hydro Energy-- Plant Design & Operation
CONNECTICUT
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC POWER
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
HYDROELECTRIC POWER PLANTS
LEGAL ASPECTS
LEGISLATION
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER PLANTS
RATE STRUCTURE
REGULATIONS
RETROFITTING
USA
130300* -- Hydro Energy-- Plant Design & Operation
CONNECTICUT
ECONOMIC ANALYSIS
ECONOMICS
ELECTRIC POWER
ENVIRONMENTAL IMPACTS
FEASIBILITY STUDIES
HYDROELECTRIC POWER PLANTS
LEGAL ASPECTS
LEGISLATION
NORTH AMERICA
NORTH ATLANTIC REGION
POWER
POWER PLANTS
RATE STRUCTURE
REGULATIONS
RETROFITTING
USA