Coal-Fired MHD Combustor Development Project: Phase IV, Final technical report, April 10, 1987--September 23, 1988

Technical Report ·
OSTI ID:6623315
This report presents the results and accomplishments of Phase IV activities culminated with the shipment of two key combustion system components to the DOE Component Development and Integration Facility (CDIF) in Butte, Montana. Integrated testing of the 50 MW/sub t/ workhorse slagging coal combustor in conjunction with the 1A1 power train will directly support the on-going MHD Integrated Topping Cycle Proof-of-Concept (POC) Program. The scope of the effort completed included: the fabrication, assembly, hot-fire checkout testing and shipment to the CDIF of a low preheat coal-fired precombustor; the procurement and shipment to the CDIF of a continuous slag removal and electrical isolation system; and the continuation of on-site engineering and hardware repair activities in support of 50 MW/sub t/ power train testing at CDIF. 86 figs., 20 tabs.
Research Organization:
TRW Space and Technology Group, Redondo Beach, CA (USA). Applied Technology Div.
DOE Contract Number:
AC22-87PC90255
OSTI ID:
6623315
Report Number(s):
DOE/PC/90255-T2; MHD-IV-089; ON: DE89002168
Country of Publication:
United States
Language:
English