Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Coal-fired MHD test progress at the Component Development and Integration Facility

Conference ·
OSTI ID:273299
The Component Development and Integration Facility (CDIF) is a Department of Energy test facility operated by MSE, Inc. MSE personnel are responsible for integrated testing of topping cycle components for the national coal-fired magnetohydrodynamics (MHD) development program. Initial facility checkout and baseline data generation testing at the CDIF used a 50-MW{sub t}, oil-fired combustor (with ash injection to simulate coal slag carryover) coupled to the 1A{sub 1} supersonic workhorse channel. In the fall of 1984, a 50-MW{sub t}, pressurized, slag rejecting coal-fired workhorse combustor replaced the oil-fired combustor in the test train. In the spring of 1989, a coal-fired precombustor was added to the test hardware, and current controls were installed in the spring of 1990. In the fall of 1990, the slag rejector was installed. In the spring of 1992, a 50-MW{sub t} pressurized, slag rejecting coal-fired prototypical combustor replaced the workhorse combustor in the test train. A 1A{sub 4} supersonic prototypical channel replaced the 1A{sub 1} workhorse channel in the fall of 1993. This prototypical hardware is slated to be used for the proof-of-concept (POC) testing. Improved facility systems targeting longer duration testing and more reliable operation will be discussed, including the air emissions control and monitoring hardware, oxygen and nitrogen expansion, coal and seed system upgrades, A-Bay modifications, and new solid suspension injection equipment.
DOE Contract Number:
AC22-88ID12735
OSTI ID:
273299
Report Number(s):
CONF-930626--
Country of Publication:
United States
Language:
English

Similar Records

Coal-fired MHD test progress at the component development and integration facility
Conference · Fri Dec 30 23:00:00 EST 1994 · OSTI ID:381408

Coal-fired MHD (magnetohydrodynamics) combustor development project, Phase 3D
Technical Report · Sun Oct 01 00:00:00 EDT 1989 · OSTI ID:7037258

Coal-Fired MHD Combustor Development Project: Phase IV, Final technical report, April 10, 1987--September 23, 1988
Technical Report · Fri Sep 23 00:00:00 EDT 1988 · OSTI ID:6623315