skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Installation-restoration program. Phase 2. Confirmation/quantification. Stage 1. Chanute Air Force Base, Rantoul, Illinois. Volume 1. Final report, October 1984-October 1986

Technical Report ·
OSTI ID:6578315

A problem-confirmation study was performed at seven sites on Chanute AFB identified in the Phase I investigation as requiring further study (Fire Training Areas 1 and 2, Landfill Nos. 1,2,3 and 4, and Building 932 Fuel Oil Storage Area). The field investigation was conducted from October 1984 to June 1985 and included the installation of 25 monitor wells, collection and analysis of groundwater samples from monitor wells, and collection and analysis of soil samples from the Building 932 Area. Analytes include VOA, TOC, TDS, Oil and Grease, EP Toxicity, Ignitibility, Xylene, Phenol, Chromium, 2,4-D and 2,4,5-TP. Based on the hydro-geologic complexity of the physical setting and findings of the sampling and analytical work, follow-on investigations were recommended at all seven sites.

Research Organization:
Weston (Roy F.), Inc., West Chester, PA (USA)
OSTI ID:
6578315
Report Number(s):
AD-A-177113/8/XAB
Resource Relation:
Other Information: See also Volume 2, AD-A177 114
Country of Publication:
United States
Language:
English