skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Costs of Storing and Transporting Hydrogen

Abstract

An analysis was performed to estimate the costs associated with storing and transporting hydrogen. These costs can be added to a hydrogen production cost to determine the total delivered cost of hydrogen. Storage methods analyzed included compressed gas, liquid hydrogen, metal hydride, and underground storage. Major capital and operating costs were considered over a range of production rates and storage times.

Authors:
Publication Date:
Research Org.:
National Renewable Energy Lab., Golden, CO (US)
Sponsoring Org.:
US Department of Energy (US)
OSTI Identifier:
6574
Report Number(s):
NREL/TP-570-25106; ON: DE00006574
ON: DE00006574; TRN: US200305%%988
DOE Contract Number:  
AC36-99GO10337
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 27 Jan 1999; PBD: 27 Jan 1999; PBD: 27 Jan 1999
Country of Publication:
United States
Language:
English
Subject:
08 HYDROGEN; 29 ENERGY PLANNING, POLICY AND ECONOMY; CAPITAL; HYDROGEN; HYDROGEN PRODUCTION; OPERATING COST; PRODUCTION; STORAGE; UNDERGROUND STORAGE; RENEWABLE ENERGY SOURCES; STORAGE METHODS; COMPRESSED GAS; LIQUID HYDROGEN; METAL HYDRIDE

Citation Formats

Amos, W A. Costs of Storing and Transporting Hydrogen. United States: N. p., 1999. Web. doi:10.2172/6574.
Amos, W A. Costs of Storing and Transporting Hydrogen. United States. doi:10.2172/6574.
Amos, W A. Wed . "Costs of Storing and Transporting Hydrogen". United States. doi:10.2172/6574. https://www.osti.gov/servlets/purl/6574.
@article{osti_6574,
title = {Costs of Storing and Transporting Hydrogen},
author = {Amos, W A},
abstractNote = {An analysis was performed to estimate the costs associated with storing and transporting hydrogen. These costs can be added to a hydrogen production cost to determine the total delivered cost of hydrogen. Storage methods analyzed included compressed gas, liquid hydrogen, metal hydride, and underground storage. Major capital and operating costs were considered over a range of production rates and storage times.},
doi = {10.2172/6574},
journal = {},
number = ,
volume = ,
place = {United States},
year = {1999},
month = {1}
}

Technical Report:

Save / Share: