Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Overall review of work carried out at Grimethorpe in collaboration with US DOE and EPRI and under IEA Agreement on PFBC (pressurised fluidised bed combustion), 1985-1987

Technical Report ·
OSTI ID:6567721
Between 1984 and 1988, the Grimethorpe Pressurized Fluidized Bed Combustion (PFBC) Facility was operated for the UK BCC/CEGB Joint Programme on PFBC. Additional funding was obtained from the US Department of Energy (for investigation of operation using a wet slurry feed system), EPRI (for testing an advanced gas filtration device) and as an extension of the IEA Agreement in PFBC (for design of the wet slurry feed system, and further studies into the use of wet slurry). Co-operation with the US DOE extended to the investigation of metal wastage in a new tube bank, Tube Bank E', involving a US boiler manufacture, Foster Wheeler Development Corporation. The report outlines the results of this collaborative work including combustor performance, operation and performance of the wet slurry feeding system, operation and performance of the EPRI HTHP Filter, and performance of research instrumentation. It also summarizes materials aspects of the collaborative work, including those aspects of the tube bank metal wastage investigation which can be released into the public domain. 39 refs., 27 figs., 17 tabs.
Research Organization:
National Coal Board, Nottingham (UK)
Sponsoring Organization:
DOE/FE
DOE Contract Number:
FC21-86MC22220
OSTI ID:
6567721
Report Number(s):
DOE/MC/22220-2895; ON: DE90015336
Country of Publication:
United States
Language:
English