Materials experience of the public domain portions of Tube Bank E' during Test Series A2
Technical Report
·
OSTI ID:6131806
The tube banks at the Grimethorpe pressurized fluidized bed combustion facility are discussed. Tube Bank E'' was designed for operation as the in bed heat exchanger during Test Series A2 at the Grimethorpe PFBC Establishment between March and November 1987. The supply of the tube bank resulted from an agreement between Foster Wheeler Development Corporation (FWDC), the US Department of Energy, and the Operating Agent for the British Coal/CEGB Joint Programme on PFBC. The tube bank incorporated features, designed to produce acceptable and predictable wastage characteristics, suggested by both FWDC and BCC/CEGB interests. As part of the agreement between the various parties, it was agreed only data from 55% of the tube bank would enter the public domain. This report describes the tube bank, and describes and discusses the public domain wastage results following a total operating period approaching 1450 hours. It is concluded that although conditions varied throughout Test Series A2, there were no major differences in the aggressiveness of the bed. Armouring devices suggested by FWDC were not successful, but their chromised coatings offered promise. The results from UK proprietary parts of the tube bank indicated that the tube bank metal wastage need not be a life limiting problem for PFBC in-bed heat exchangers. 5 refs., 48 figs., 6 tabs.
- Research Organization:
- National Coal Board, Nottingham (UK)
- Sponsoring Organization:
- DOE/FE
- DOE Contract Number:
- FC21-86MC22220
- OSTI ID:
- 6131806
- Report Number(s):
- DOE/MC/22220-2892; ON: DE90015335
- Country of Publication:
- United States
- Language:
- English
Similar Records
Overall review of work carried out at Grimethorpe in collaboration with US DOE and EPRI and under IEA Agreement on PFBC (pressurised fluidised bed combustion), 1985-1987
General components experience at the Grimethorpe PFBC (Pressurised Fluidised Bed Combustion) Facility during Test Series A2
Plan for Test Series A2. 2
Technical Report
·
Fri Jun 01 00:00:00 EDT 1990
·
OSTI ID:6567721
General components experience at the Grimethorpe PFBC (Pressurised Fluidised Bed Combustion) Facility during Test Series A2
Technical Report
·
Fri Jun 01 00:00:00 EDT 1990
·
OSTI ID:6202082
Plan for Test Series A2. 2
Technical Report
·
Sat Oct 31 23:00:00 EST 1987
·
OSTI ID:6348512
Related Subjects
01 COAL, LIGNITE, AND PEAT
014000* -- Coal
Lignite
& Peat-- Combustion
20 FOSSIL-FUELED POWER PLANTS
200104 -- Fossil-Fueled Power Plants-- Components
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COATINGS
COMBUSTION
CORROSION
DEMONSTRATION PLANTS
DESIGN
DISPERSIONS
DOCUMENT TYPES
ENERGY SOURCES
EUROPE
FABRICATION
FLUIDIZED-BED COMBUSTION
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUEL SLURRIES
FUELS
HEAT EXCHANGERS
MATERIALS
MIXTURES
OXIDATION
POWER PLANTS
PROGRESS REPORT
SLURRIES
SUSPENSIONS
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TUBES
UNITED KINGDOM
WESTERN EUROPE
014000* -- Coal
Lignite
& Peat-- Combustion
20 FOSSIL-FUELED POWER PLANTS
200104 -- Fossil-Fueled Power Plants-- Components
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COATINGS
COMBUSTION
CORROSION
DEMONSTRATION PLANTS
DESIGN
DISPERSIONS
DOCUMENT TYPES
ENERGY SOURCES
EUROPE
FABRICATION
FLUIDIZED-BED COMBUSTION
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUEL SLURRIES
FUELS
HEAT EXCHANGERS
MATERIALS
MIXTURES
OXIDATION
POWER PLANTS
PROGRESS REPORT
SLURRIES
SUSPENSIONS
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TUBES
UNITED KINGDOM
WESTERN EUROPE