Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tank waste consolidation analysis for transfer of ORNL RH-TRU tank sludges to the Melton Valley Storage Tanks

Technical Report ·
DOI:https://doi.org/10.2172/656524· OSTI ID:656524

The objective of this work is to evaluate the schedule and technical issues associated with consolidation of Remote Handled Transuranic (RH-TRU) sludges in the Melton Valley Storage Tanks (MVSTs). This work supports the DOE Transuranic Waste (TRU) Program plans for private sector treatment of all ORNL TRU sludges for disposal at the Waste Isolation Pilot Plant (WIPP). Transfer of these sludges must be completed in FY 2000 to meet the required schedule for beginning shipment of treated sludges to the WIPP by 2002. This study was performed to (1) evaluate the sludge transfer schedule, (2) evaluate the ability of existing tank systems to contain and manage the sludges and liquids generated during the transfers, and (3) evaluate the costs and schedules of different solid/liquid separation and solids-monitoring methods used during sludge transfer for management of sluice waters.

Research Organization:
Oak Ridge National Lab., TN (United States)
Sponsoring Organization:
USDOE, Washington, DC (United States)
DOE Contract Number:
AC05-96OR22464
OSTI ID:
656524
Report Number(s):
ORNL/TM--13367; ON: DE98003617
Country of Publication:
United States
Language:
English