Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I, Preliminary Engineering, Phase II, Pilot Plant final design, Phase III, Construction. Quarterly report, September 1-November 30, 1979
Technical progress during the period September 1 through November 30, 1979 on the design and testing of a pressurized fluidized-bed pilot plant for power generation is described. Additional 1168 h of testing of the high sulfur coal fired SGT/PFB Technology Rig is reported. Modifications and performance improvement of the hot gas cleanup system are presented. As part of this testing, operation of the small gas turbine engine on PFB coal combustion gas for an objective of 1000 h was initiated during this period. Candidate turbine blade and vane materials and coatings to improve operational durability were being evaluated during test. A total of 925 h of gas turbine operation was accumulated to date without incident. Pilot Plant final design progressed satisfactorily and nears completion. Pilot Plant internal design conditions modified to reflect changes in system pressure and temperature losses are presented. The information developed in the SGT/PFB Technology Rig is being integrated into Pilot Plant design. System start-up logic has been revised to include a pre-start heating/drying of refractory lined piping and vessels. Advertisement for Pilot Plant construction subcontractors was initiated. Long lead procurement continued and will be completed next quarter.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC21-76ET10417
- OSTI ID:
- 6508791
- Report Number(s):
- FE-1726-50A; CW-WR-76-015.50A
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power: Phase I, preliminary engineering, Phase II, final design. Annual report, March 1, 1978-February 28, 1979
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I. Preliminary engineering; Phase II. Pilot plant final design; Phase III. Construction. Quarterly report, June 1-August 31, 1979
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:5987569
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I. Preliminary engineering; Phase II. Pilot plant final design; Phase III. Construction. Quarterly report, June 1-August 31, 1979
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:5989676
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering
Technical Report
·
Mon Mar 31 23:00:00 EST 1980
·
OSTI ID:5344699
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200100* -- Fossil-Fueled Power Plants-- Power Plants & Power Generation
AIR POLLUTION CONTROL
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
DESIGN
ENERGY SOURCES
ENGINES
EXHAUST GASES
FLUIDIZED-BED COMBUSTION
FLUIDIZED-BED COMBUSTORS
FLUIDS
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUELS
GAS TURBINE ENGINES
GASEOUS WASTES
GASES
HEAT ENGINES
HEAT EXCHANGERS
HOT GAS CLEANUP
INTERNAL COMBUSTION ENGINES
MATERIALS
OPERATION
OXIDATION
PERFORMANCE TESTING
POLLUTION CONTROL
POWER PLANTS
PURIFICATION
RESEARCH PROGRAMS
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
WASTES
200100* -- Fossil-Fueled Power Plants-- Power Plants & Power Generation
AIR POLLUTION CONTROL
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
COAL
COMBINED-CYCLE POWER PLANTS
COMBUSTION
COMBUSTORS
DESIGN
ENERGY SOURCES
ENGINES
EXHAUST GASES
FLUIDIZED-BED COMBUSTION
FLUIDIZED-BED COMBUSTORS
FLUIDS
FOSSIL FUELS
FOSSIL-FUEL POWER PLANTS
FUELS
GAS TURBINE ENGINES
GASEOUS WASTES
GASES
HEAT ENGINES
HEAT EXCHANGERS
HOT GAS CLEANUP
INTERNAL COMBUSTION ENGINES
MATERIALS
OPERATION
OXIDATION
PERFORMANCE TESTING
POLLUTION CONTROL
POWER PLANTS
PURIFICATION
RESEARCH PROGRAMS
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
WASTES