Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I. Preliminary engineering; Phase II. Pilot plant final design; Phase III. Construction. Quarterly report, June 1-August 31, 1979

Technical Report ·
OSTI ID:5989676
Additional testing of the small gas turbine/pressurized fluidized bed (SGT/PFB) Technology Unit that has been accomplished. The new 3-stage hot gas cleanup system evaluation indicates improvements are required. Modification to the first and second stage cyclones are in process. A 150-hour endurance/baseline test on the Rover gas turbine engine was completed. The Pilot Plant design continues. However PFB structural design awaits further technology rig testing to establish final definition of hot gas cleanup system. The procurement of long lead raw materials and of engineering drawings for material handling equipment continues.
Research Organization:
Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
DOE Contract Number:
AC21-76ET10417
OSTI ID:
5989676
Report Number(s):
CW-WR-76-015.49A; FE-1726-49A; ON: DE82004275
Country of Publication:
United States
Language:
English