Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I. Preliminary engineering; Phase II. Pilot plant final design; Phase III. Construction. Quarterly report, June 1-August 31, 1979
Technical Report
·
OSTI ID:5989676
Additional testing of the small gas turbine/pressurized fluidized bed (SGT/PFB) Technology Unit that has been accomplished. The new 3-stage hot gas cleanup system evaluation indicates improvements are required. Modification to the first and second stage cyclones are in process. A 150-hour endurance/baseline test on the Rover gas turbine engine was completed. The Pilot Plant design continues. However PFB structural design awaits further technology rig testing to establish final definition of hot gas cleanup system. The procurement of long lead raw materials and of engineering drawings for material handling equipment continues.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC21-76ET10417
- OSTI ID:
- 5989676
- Report Number(s):
- CW-WR-76-015.49A; FE-1726-49A; ON: DE82004275
- Country of Publication:
- United States
- Language:
- English
Similar Records
Engineer, design, construct, test and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power. Phase I, Preliminary Engineering, Phase II, Pilot Plant final design, Phase III, Construction. Quarterly report, September 1-November 30, 1979
Engineer, design construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power: Phase I. Preliminary engineering; Phase II. Final design; Phase III. Construction. Annual report, March 1, 1979-February 29, 1980
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering
Technical Report
·
Sun Dec 31 23:00:00 EST 1978
·
OSTI ID:6508791
Engineer, design construct, test, and evaluate a pressurized fluidized-bed pilot plant using high-sulfur coal for production of electric power: Phase I. Preliminary engineering; Phase II. Final design; Phase III. Construction. Annual report, March 1, 1979-February 29, 1980
Technical Report
·
Mon Dec 31 23:00:00 EST 1979
·
OSTI ID:5641050
Engineer, design, construct, test and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering
Technical Report
·
Mon Mar 31 23:00:00 EST 1980
·
OSTI ID:5344699
Related Subjects
42 ENGINEERING
421000* -- Engineering-- Combustion Systems
CATHODIC PROTECTION
COMBUSTORS
COMPRESSORS
CONSTRUCTION
CORROSION PROTECTION
DESIGN
ELECTRIC GROUNDS
ENGINES
EQUIPMENT
FLUIDIZED-BED COMBUSTORS
FUNCTIONAL MODELS
GAS TURBINE ENGINES
GAS TURBINES
HEAT ENGINES
HOT GAS CLEANUP
INTERNAL COMBUSTION ENGINES
MACHINERY
MATERIALS HANDLING EQUIPMENT
PARTICLES
PARTICULATES
PILOT PLANTS
PLANNING
PROCUREMENT
PURIFICATION
TESTING
TURBINES
TURBOMACHINERY
421000* -- Engineering-- Combustion Systems
CATHODIC PROTECTION
COMBUSTORS
COMPRESSORS
CONSTRUCTION
CORROSION PROTECTION
DESIGN
ELECTRIC GROUNDS
ENGINES
EQUIPMENT
FLUIDIZED-BED COMBUSTORS
FUNCTIONAL MODELS
GAS TURBINE ENGINES
GAS TURBINES
HEAT ENGINES
HOT GAS CLEANUP
INTERNAL COMBUSTION ENGINES
MACHINERY
MATERIALS HANDLING EQUIPMENT
PARTICLES
PARTICULATES
PILOT PLANTS
PLANNING
PROCUREMENT
PURIFICATION
TESTING
TURBINES
TURBOMACHINERY