Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Evaluation of severe accident risks: Surry Unit 1

Technical Report ·
OSTI ID:6491785
 [1];  [2];  [3];  [4]
  1. Sandia National Labs., Albuquerque, NM (USA)
  2. Arizona State Univ., Tempe, AZ (USA)
  3. Technadyne Engineering Consultants, Inc., Albuquerque, NM (USA)
  4. Science Applications International Corp., Albuquerque, NM (USA)

In support of the Nuclear Regulatory Commission's (NRC's) assessment of the risk from severe accidents at commercial nuclear power plants in the US reported in NUREG-1150, the Severe Accident Risk Reduction Program (SARRP) has completed a revised calculation of the risk to the general public from severe accidents at the Surry Power Station, Unit 1. This power plant, located in southeastern Virginia, is operated by the Virginia Electric Power Corp. The emphasis in this risk analysis was not on determining a so-called'' point estimate of risk. Rather, it was to determine the distribution of risk, and to discover the uncertainties that account for the breadth of this distribution. Off-site risk initiation by events, both internal to the power station and external to the power station were assessed. This document, Volume 3, Revision 1, Part 2, provides Appendices A through E to this report. These appendices contain: supporting information for the accident progression analysis; the source term analysis; the consequence analysis; risk results; and sampling information.

Research Organization:
Nuclear Regulatory Commission, Washington, DC (USA). Div. of Systems Research; Sandia National Labs., Albuquerque, NM (USA)
Sponsoring Organization:
NRC
DOE Contract Number:
AC04-76DP00789
OSTI ID:
6491785
Report Number(s):
NUREG/CR-4551-Vol.3-Rev.1-Pt.2; SAND--86-1309-Vol.3-Rev.1-Pt.2; ON: TI91004092; CNN: A1322
Country of Publication:
United States
Language:
English