Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pilot-plant startup and acceptance-test plan (RADL Item 2-46). 10-MWe solar-thermal central-receiver pilot plant. Solar-facilities design integration

Technical Report ·
DOI:https://doi.org/10.2172/6487092· OSTI ID:6487092
A test plan is provided for the pilot plant preoperational and acceptance test activities to be performed at the pilot plant test site located adjacent to the Coolwater Generation Station in Daggett, 12 miles southeast of Barstow in San Bernardino County, California. Presented is a description of the overall test program, the pilot plant system breakdown structure, preoperational and acceptance test specifications, and test management, data, and documentation requirements. Also presented as appendices are expanded pilot plant startup test schedules and a brief summary of startup-related construction tests.
Research Organization:
McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
6487092
Report Number(s):
MDC-G-9330; SAN-0499-78
Country of Publication:
United States
Language:
English