Impact of the metric system on the SAREF project

Technical Report ·
OSTI ID:6477074

The SAREF conceptual design may be required to be completed in metric units. In an effort to determine the impact of this requirement on Bechtel, several potential problem areas were investigated: drafting experience in metric units; engineering experience in metric units; availability of training support for project personnel in the use of metric units; and present status of US engineering standards in metric units. In addition, considering both the conceptual design phase and the detailed design and construction phase beyond, Bechtel's Procurement Service was requested to determine if pipes, valves and pumps (both nuclear and non-nuclear) were readily available in standard metric sizes from US suppliers. Finally, both the construction and quality assurance groups in the San Francisco Power Division were requested to evaluate the impact of the metric system in their areas.

Research Organization:
General Electric Co., Sunnyvale, CA (USA); Bechtel Corp., New York (USA)
DOE Contract Number:
AT03-76SF72024
OSTI ID:
6477074
Report Number(s):
DOE/SF/72024-T4; ON: DE81026933
Country of Publication:
United States
Language:
English

Similar Records

Safety Research Experiment Facility Project. Conceptual design report. Volume II. Building and facilities
Technical Report · Sun Nov 30 23:00:00 EST 1975 · OSTI ID:5167649

Standardizing generating plants. IV
Journal Article · Sun Dec 31 23:00:00 EST 1978 · Electr. World; (United States) · OSTI ID:6010367

Performance assessment in the repository design process
Conference · Wed Dec 31 23:00:00 EST 1986 · Trans. Am. Nucl. Soc.; (United States) · OSTI ID:6885649