skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: EM 0211: standpipe-bubbler pump level control study, cover gas system analysis, (TASK B), W. P. 7373. [LMFBR]

Technical Report ·
DOI:https://doi.org/10.2172/6474840· OSTI ID:6474840

In addition to the basic definition of the Standpipe Bubbler performance, several tasks pertaining to specific cover gas/pump interface design problems were included within the Standpipe Bubbler Study effort. This report covers the following noted specific tasks of the Standpipe Bubbler Study: gas supply system design; gas ingestion by pump; identification of failure modes and recovery methods; manual override system; and effect of loss of gas pressure.

Research Organization:
Byron Jackson Pumps, Inc., Los Angeles, CA (USA)
DOE Contract Number:
AT03-76SF98001
OSTI ID:
6474840
Report Number(s):
DOE/SF/98001-T3
Country of Publication:
United States
Language:
English