Mechanical response of shock conditioned HPNS-5 (R-1) grout
HPNS-5 (R-1) grout is a portland cement formulated mix designed for use as a rigid containment plug in vertical boreholes at the Nevada Test Site. Coincident with field testing of this grout in 1991 and 1992 , two arums of the grout mix were collected and positioned in the by pass drift of the DISTANT ZENITH event to expose the grout to passage of a nuclear driven stress wave. The drums were later retrieved to determine the mechanical behavior of the shock conditioned grout. Sealed hollow tubes positioned within the grout-filled drums to detect ductile flow on passage of the stress wave were found partially to completely filled with HPNS-5 grout following the experiment. Static mechanical tests support the evidence for ductile flow and place the transition from brittle fracture failure to ductile behavior in the shock conditioned grout at a confining stress between ambient and 5 MPa (725 psi). Uniaxial and triaxial tests delineated a stress-strain field for interstice collapse that interposes between the mechanics of linear elastic deformation and dilatancy. Hydrostatic stress loading between 25 MPa (3.6 ksi) and 60 MPa (8.7 ksi) results in a significant change of permanent set from 1% to greater than 15% volume strain.
- Research Organization:
- Los Alamos National Lab., NM (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 645570
- Report Number(s):
- LA-UR--97-5006; ON: DE98004315
- Country of Publication:
- United States
- Language:
- English
Similar Records
Material properties of Nevada Test Site tuff and grout. Final report, 1 September 1978-31 August 1979
Properties of tuffs, grout and other materials. Final report 1 Sep 79-31 Nov 81
Hydroplus experimental study of dry, saturated, and frozen geological materials. Technical report, 15 July 1991-30 September 1992
Technical Report
·
Thu May 01 00:00:00 EDT 1980
·
OSTI ID:60257
Properties of tuffs, grout and other materials. Final report 1 Sep 79-31 Nov 81
Technical Report
·
Thu Dec 31 23:00:00 EST 1981
·
OSTI ID:60299
Hydroplus experimental study of dry, saturated, and frozen geological materials. Technical report, 15 July 1991-30 September 1992
Technical Report
·
Thu Mar 31 23:00:00 EST 1994
·
OSTI ID:7067345