Pipeline Gas Demonstration Plant. Phase I. Annual technical progress report, July 1, 1979-June 30, 1980
Contract No. EF-77-C-01-2542 between Conoco Inc., and the US Department of Energy requires Conoco Inc. to design, construct, and operate a demonstration plant for the manufacture of high-Btu gas from bituminous coal. The project is currently in the design phase, which is scheduled for completion by June 30, 1981. During the reporting period of July 1, 1979 through June 30, 1980 the main accomplishments were: near completion of Task II, Demonstration Plant Process Design; Task IV, Demonstration Plant Environmental Analysis, was completed and the Environmental Analysis Report (FE-2542-25 Vols. 1 through 6) was issued; applications have been filed for Prevention of Significant Deterioration (PSD) Permit, Permit to Install (PTI), National Pollution Discharge Elimination System (NPDES) Permit and Permit to Build the Water Intake; DOE has approved all but two of the proprietary process licenses required for the Demonstration Plant; and Conoco Inc. has implemented a configuration and resource control plan to manage engineering change, cost growth, and schedule slippage in the engineering tasks. The main design effort in the final year of Phase I will be directed to Task VI, Demonstration Plant Engineering Design; Task VII, Construction Planning; and Task X, Long Lead Time Items.
- Research Organization:
- Conoco, Inc., Stamford, CT (USA)
- DOE Contract Number:
- AC01-77ET13060
- OSTI ID:
- 6434723
- Report Number(s):
- DOE/ET/13060-T2; FE-2542-30
- Country of Publication:
- United States
- Language:
- English
Similar Records
Phase I. Pipeline gas demonstration plant. Volume I. Schedules, controls, and staffing
Pipeline-gas demonstration plant, Phase I. Long-lead-time items
Related Subjects
010404* -- Coal
Lignite
& Peat-- Gasification
017000 -- Coal
Lignite
& Peat-- Legislation & Regulations
ADMINISTRATIVE PROCEDURES
AMMONIA
AROMATICS
BEAVON PROCESS
BENFIELD PROCESS
CHEMICAL REACTIONS
COAL GASIFICATION
COAL GASIFICATION PLANTS
CRG PROCESSES
DEMONSTRATION PLANTS
DESIGN
DIAGRAMS
ENGINEERING
EQUIPMENT
GASIFICATION
HYDRIDES
HYDROGEN COMPOUNDS
HYDROXY COMPOUNDS
INDUSTRIAL PLANTS
LICENSES
LURGI SLAGGING PROCESS
METHANATION
NITROGEN COMPOUNDS
NITROGEN HYDRIDES
ORGANIC COMPOUNDS
PERMIT APPLICATIONS
PHENOLS
RECOVERY
RECTISOL PROCESS
SHIFT PROCESSES
STRETFORD PROCESS
THERMOCHEMICAL PROCESSES