Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, August-October 1985
Technical Report
·
OSTI ID:6421724
Construction of the 20 lb per hour modular test plant has been initiated and all major equipment has been received with the exception of the caustic-water evaporator and the rotary kiln, which are scheduled for December and January, respectively. Construction, checkout and shakedown is on schedule with the three sections of the modular test plant planned for completion together with checkout and shakedown by March. A topical report containing the detailed plant design, shakedown plans and a preliminary test plan was submitted to the DOE. A third kiln test was successfully performed at the kiln vendor test facility to provide information on long-term operation of the kiln as well as a supply of coal-caustic products sufficient for shakedown of both the filtration and regeneration sections of the modular test plant. Regeneration verification and intermediate scale up testing, initiated last quarter, was completed resulting in a confirmation and refining of the data previously obtained for regeneration. Considerable information was also generated on the filtration of spent caustic solution. It was determined that mineral matter reject contains only $1 worth of caustic per ton of coal processed. This study will be presented in detail in a topical report to be issued this month. Filtration testing of separation of concentrated caustic-coal slurries was conducted both at laboratory scale utilizing an 0.1 square foot leaf filter and in a commercial one square foot rotary drum vacuum filter. The observed laboratory cake moisture level of 2.6 to 1 w/w decreased to 2.2 when performed in the one square foot rotary vacuum drum filter. 2 figs., 2 tabs.
- Research Organization:
- TRW Space and Technology Group, Redondo Beach, CA (USA)
- DOE Contract Number:
- AC22-83PC63032
- OSTI ID:
- 6421724
- Report Number(s):
- DOE/PC/63032-T7; ON: DE86003911
- Country of Publication:
- United States
- Language:
- English
Similar Records
Bench scale development of the TRW process for cleaning coal. Gravimelt process. Quarterly technical progress report, November 1985-January 1986
Bench scale development of the TRW process for cleaning coal (gravimelt process): Quarterly technical progress report for the period February 1986-April 1986
Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, May 1985-July 1985
Technical Report
·
Mon Feb 17 23:00:00 EST 1986
·
OSTI ID:6213097
Bench scale development of the TRW process for cleaning coal (gravimelt process): Quarterly technical progress report for the period February 1986-April 1986
Technical Report
·
Fri May 23 00:00:00 EDT 1986
·
OSTI ID:7055796
Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, May 1985-July 1985
Technical Report
·
Thu Aug 01 00:00:00 EDT 1985
·
OSTI ID:6231639
Related Subjects
01 COAL, LIGNITE, AND PEAT
010402* -- Coal
Lignite
& Peat-- Purification & Upgrading
013000 -- Coal
Lignite
& Peat-- Transport
Handling
& Storage
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COAL PREPARATION PLANTS
DESULFURIZATION
ENERGY SOURCES
FOSSIL FUELS
FUELS
INDUSTRIAL PLANTS
KILNS
MATERIALS
SEPARATION EQUIPMENT
TESTING
TRW PROCESS
010402* -- Coal
Lignite
& Peat-- Purification & Upgrading
013000 -- Coal
Lignite
& Peat-- Transport
Handling
& Storage
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COAL PREPARATION PLANTS
DESULFURIZATION
ENERGY SOURCES
FOSSIL FUELS
FUELS
INDUSTRIAL PLANTS
KILNS
MATERIALS
SEPARATION EQUIPMENT
TESTING
TRW PROCESS