Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, May 1985-July 1985
Technical Report
·
OSTI ID:6231639
The major sections of the 20 lb/h modular test plant were designed and the necessary equipment specifications were prepared. A competitive procurement was initiated for the reaction section, a rotary kiln with coal and caustic feed capability. Two kiln tests were performed at a vendor test facility to provide design data, demonstrate continuous around the clock operation and to provide coal and spent caustic feed for regeneration and filtration equipment tests. The first two objectives were successful and accomplishment of the second objective will be assessed next month. Experimentation for scale-up and verification testing of the regeneration section was performed. A description of the modular test plant and the detailed engineering and test results are presented in five sections entitled: Modular Test Plant; Rotary Kiln Tests; Rotary Kiln Specifications; Regeneration Verification Tests and Regeneration Section Design. 1 fig., 3 tabs.
- Research Organization:
- TRW Space and Technology Group, Redondo Beach, CA (USA)
- DOE Contract Number:
- AC22-83PC63032
- OSTI ID:
- 6231639
- Report Number(s):
- DOE/PC/63032-T6; ON: DE85018277
- Country of Publication:
- United States
- Language:
- English
Similar Records
Bench scale development of the TRW process for cleaning coal. Gravimelt process. Quarterly technical progress report, November 1985-January 1986
Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, August-October 1985
Bench scale development of the TRW process for cleaning coal (gravimelt process): Quarterly technical progress report for the period February 1986-April 1986
Technical Report
·
Mon Feb 17 23:00:00 EST 1986
·
OSTI ID:6213097
Bench scale development of the TRW process for cleaning coal (Gravimelt process). Quarterly technical progress report, August-October 1985
Technical Report
·
Thu Oct 31 23:00:00 EST 1985
·
OSTI ID:6421724
Bench scale development of the TRW process for cleaning coal (gravimelt process): Quarterly technical progress report for the period February 1986-April 1986
Technical Report
·
Fri May 23 00:00:00 EDT 1986
·
OSTI ID:7055796
Related Subjects
01 COAL, LIGNITE, AND PEAT
010402* -- Coal
Lignite
& Peat-- Purification & Upgrading
013000 -- Coal
Lignite
& Peat-- Transport
Handling
& Storage
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COAL PREPARATION
DESIGN
DESULFURIZATION
ENERGY SOURCES
FOSSIL FUELS
FUELS
KILNS
MATERIALS
TESTING
TRW PROCESS
010402* -- Coal
Lignite
& Peat-- Purification & Upgrading
013000 -- Coal
Lignite
& Peat-- Transport
Handling
& Storage
CARBONACEOUS MATERIALS
CHEMICAL REACTIONS
CLEANING
COAL
COAL PREPARATION
DESIGN
DESULFURIZATION
ENERGY SOURCES
FOSSIL FUELS
FUELS
KILNS
MATERIALS
TESTING
TRW PROCESS