Preliminary design and assessment of a 50,000-BPD coal-to-methanol-to-gasoline plant. Final report. [W. R. Grace project coal-gasification-methanol-gasoline project at Baskett, KY]
The information presented in this volume is intended as a guide and reference source to the more detailed information contained in specific project deliverables. Each task discussion includes a listing of the deliverables which have been submitted to DOE as documentation of specific contractual requirements and briefly describes the scope of information presented in the deliverables. Appendix 4 to this report is a listing of the deliverables prepared and the dates of submission of each deliverable. In reviewing this Final Report it should be remembered that Tasks 1 through 9 documented work on the 50,000 BPD plant, Task 11 covered all aspects of the 12,500 BPD plant and Task 10 was applicable to management and control of all work performed under the CA.
- Research Organization:
- Grace (W.R.) and Co., Memphis, TN (USA). Agricultural Chemicals Group
- DOE Contract Number:
- FC02-80ET14759
- OSTI ID:
- 6414638
- Report Number(s):
- DOE/ET/14759-T14; ON: DE83008235
- Country of Publication:
- United States
- Language:
- English
Similar Records
Preliminary design and assessment of a 50,000-BPD coal-to-methanol-to-gasoline plant. Quarterly technical progress report, 1 July 1982-30 September 1982
Preliminary design and assessment of a 50,000-bpd coal-to-methanol-to-gasoline plant. Quarterly technical progress report, 1 January 1982-31 March 1982
Related Subjects
010404* -- Coal
Lignite
& Peat-- Gasification
090221 -- Alcohol Fuels-- Chemical Synthesis-- (1976-1989)
10 SYNTHETIC FUELS
ADMINISTRATIVE PROCEDURES
ALCOHOLS
CHEMICAL PLANTS
COAL GASIFICATION
COAL GASIFICATION PLANTS
DESIGN
ENGINEERING
FLUIDS
GASES
GASIFICATION
GASOLINE PLANTS
HYDROXY COMPOUNDS
INDUSTRIAL PLANTS
METHANOL
METHANOL PLANTS
ORGANIC COMPOUNDS
PERMIT APPLICATIONS
PLANNING
SYNTHESIS GAS
TEXACO GASIFICATION PROCESS
THERMOCHEMICAL PROCESSES