Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary design and assessment of a 50,000-BPD coal-to-methanol-to-gasoline plant. Final report. [W. R. Grace project coal-gasification-methanol-gasoline project at Baskett, KY]

Technical Report ·
OSTI ID:6414638

The information presented in this volume is intended as a guide and reference source to the more detailed information contained in specific project deliverables. Each task discussion includes a listing of the deliverables which have been submitted to DOE as documentation of specific contractual requirements and briefly describes the scope of information presented in the deliverables. Appendix 4 to this report is a listing of the deliverables prepared and the dates of submission of each deliverable. In reviewing this Final Report it should be remembered that Tasks 1 through 9 documented work on the 50,000 BPD plant, Task 11 covered all aspects of the 12,500 BPD plant and Task 10 was applicable to management and control of all work performed under the CA.

Research Organization:
Grace (W.R.) and Co., Memphis, TN (USA). Agricultural Chemicals Group
DOE Contract Number:
FC02-80ET14759
OSTI ID:
6414638
Report Number(s):
DOE/ET/14759-T14; ON: DE83008235
Country of Publication:
United States
Language:
English