Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Massive petroline project of Petromin is under way in Saudi Arabia

Journal Article · · Pipeline News; (United States)
OSTI ID:6402450

A discussion of the project to transport 1.85-2.35 million bbl/day crude oil from the Ghawar oilfields to Yanbu, Saudi Arabia covers the pipeline construction responsibilities of Saipem S.p.A. and a joint venture of Contracting and Trading Co. (Lebanon) and Sedco Construction Division (Houston) and details of the pipes (API 5LX Grade X-65, double jointed and electrostatically coated with epoxy powder) and block valves to be used and the various facilities to be installed (pump stations, dry type air cooling facilities, pressure reducing and maintenance centers, Yanbu onshore terminal, crude oil storage tanks, the offshore terminal under construction by Mitsubishi Heavy Industries to load 1.6 million bbl/day into 50,000-500,000 dwt tankers), the terrain encountered along the route of the C.A.T./Houston western section of the pipeline, and the welding procedures used.

OSTI ID:
6402450
Journal Information:
Pipeline News; (United States), Journal Name: Pipeline News; (United States) Vol. 51:5; ISSN PPLNA
Country of Publication:
United States
Language:
English

Similar Records

Giant petroline (1200 km) 48 in. diameter oil line inching across Saudi Arabia
Journal Article · Mon Oct 01 00:00:00 EDT 1979 · Pipeline Gas J.; (United States) · OSTI ID:5329796

Saudi Arabia/crude oil exports
Journal Article · Thu Oct 05 00:00:00 EDT 1978 · Pet. Inf.; (United States) · OSTI ID:5158055

Middle East report/Saudi oil development thrusts West
Journal Article · Mon Jul 07 00:00:00 EDT 1980 · Oil Gas J.; (United States) · OSTI ID:6322534