Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Twelve years in offshore for Doris C. G

Journal Article · · Pet. Inf. Ed. Int.; (United States)
OSTI ID:6310710
The offshore engineering operations of Doris have included the design of concrete and steel offshore structures, the design and construction of diving and underwater equipment, offshore equipment, vessels, and heavy mooring systems, and the design and installation of pipelines and risers. The company has also engaged in pipelaying, marine operations, diving, and inspection and maintenance work. Some achievements in 1978 were the completion, tow-out, and installation of the Ninian central platform and the design of an additional riser for the Frigg field manifold compression platform to connect the Piper field to the Frigg gas pipeline. The articulated gravity tower for concrete platforms was certified by Norsk Veritas in 1978, but fatigue tests on the articulating ball joint are continuing. New designs include the fixed gravity structure with removable floats, which makes the substructure much smaller, so that concrete platforms become economically feasible in water depths previously considered prohibitive, and the steel-and-concrete hybrid platform, which has been fully developed and certified as safe and economical.
OSTI ID:
6310710
Journal Information:
Pet. Inf. Ed. Int.; (United States), Journal Name: Pet. Inf. Ed. Int.; (United States) Vol. 1498
Country of Publication:
United States
Language:
English

Similar Records

Concrete gravity platform for 130-m water depths
Journal Article · Sun Jan 31 23:00:00 EST 1982 · Ocean Ind.; (United States) · OSTI ID:6735345

How to reduce downtime in offshore pipelaying. Part 1
Journal Article · Wed Jul 01 00:00:00 EDT 1981 · Pipe Line Ind.; (United States) · OSTI ID:5835909

Future developments for offshore oil and gas production
Journal Article · Wed Apr 11 23:00:00 EST 1979 · Pet. Inf. Ed. Int.; (United States) · OSTI ID:6293528