Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Conversion of Solar Two to a Kokhala hybrid power tower

Conference ·
OSTI ID:623293

The continued drop in energy prices and restructuring of the utility industry have reduced the likelihood that a follow-on commercial 100-MW, power tower project will be built immediately following the Solar Two demonstration project. Given this, it would be desirable to find a way to extend the life of the Solar Two project to allow the plant to operate as a showcase for future power tower projects. This paper looks at the possibility of converting Solar Two into a commercial Kokhala hybrid power tower plant at the end of its demonstration period in 1998. The study identifies two gas turbines that could be integrated into a Kokhala cycle at Solar Two and evaluates the design, expected performance, and economics of each of the systems. The study shows that a commercial Kokhala project at Solar Two could produce power at a cost of less than 7 e/kWhr.

Research Organization:
National Renewable Energy Lab., Golden CO (United States)
Sponsoring Organization:
USDOE Assistant Secretary for Energy Efficiency and Renewable Energy, Washington, DC (United States)
DOE Contract Number:
AC36-83CH10093
OSTI ID:
623293
Report Number(s):
NREL/CP--550-23127; CONF-970441--; ON: DE97006925
Country of Publication:
United States
Language:
English

Similar Records

SMUD Kokhala Power Tower Study
Conference · Sun Jun 01 00:00:00 EDT 1997 · OSTI ID:629317

Solar power towers
Technical Report · Tue Mar 31 23:00:00 EST 1998 · OSTI ID:658297

Solar power towers
Technical Report · Tue Mar 31 23:00:00 EST 1998 · OSTI ID:10152169