Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe Solar Thermal Central receiver Pilot Plant solar facilities design integration: master control system as-built drawings (RADL Item 6-5). Volume 4: SDPC. Section 2: CCM data bases

Technical Report ·
OSTI ID:6228595

The ''as-built'' configuration of the master control system of the Barstow Solar Pilot Plant is presented. The CCM Data Bases are documented. (BCS)

Research Organization:
McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
6228595
Report Number(s):
DOE/SF/10499-T165; STMPO-255; SAN-0499-86-Vol.4-Sect.2; MDC-H-0130-Vol.4-Sect.2; ON: DE86001395
Country of Publication:
United States
Language:
English