Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. Master control system as-built drawings (RADL Item 6-5). Volume 5: interlock logic system (ILS)

Technical Report ·
OSTI ID:5055835

The as-built configuration of the master control system of the Barstow Solar Pilot Plant is presented. The interlock logic system is documented. (BCS)

Research Organization:
McDonnell Douglas Astronautics Co., Huntington Beach, CA (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
5055835
Report Number(s):
DOE/SF/10499-T167; STMPO-257; SAN-0499-86-Vol.5; MDC-H-0130-Vol.5; ON: DE86001397
Country of Publication:
United States
Language:
English