Magnetohydrodynamics coal-fired flow facility: Quarterly progress report, July--September 1988
In this Quarterly Technical progress report, UTSI reports on progress in proof-of-concept (POC) testing and development of the components for a magnetohydrodynamic (MHD) steam bottoming plant. The primary activities discussed are results of a 252 hour, coal-fired test in the Department of Energy Coal Fired Flow Facility (CFFF). The performance of the upstream components, which simulate the MHD topping cycle for the generation of test gases with the correct time-temperature history, was significantly more reliable than in previous tests. In the bottoming cycle tests continued on candidate superheater test module (SHTM) tube materials in three different temperature zones. The test achieved all objectives in this area. Difficulties continued in keeping the accumulation of deposits sufficiently blown-off on the high temperature tubes of the first test section and the following cooling section. Particulate loading samples were taken to evaluate the effectiveness of the baghouse and electrostatic precipitator (ESP). Results of varying the flow rate through the ESP to determine the minimum specific collection area (SCA) to meet the New Source Performance Standard (NSPS) particulate emission standards are reported. Reports of on-going studies and analyses are summarized. Results of utilization of advanced diagnostics by both UTSI and MSU are included. Data and analyses from stack gas analysis, water quality, ambient air sampling and terrestrial ecology programs are summarized and future plans are outlined. 14 figs., 1 tab.
- Research Organization:
- Tennessee Univ., Tullahoma (USA). Space Inst.
- DOE Contract Number:
- AC02-79ET10815
- OSTI ID:
- 6197264
- Report Number(s):
- DOE/ET/10815-126; UTSI-88-09; ON: DE89010702
- Country of Publication:
- United States
- Language:
- English
Similar Records
The magnetohydrodynamics Coal-Fired Flow Facility
The Magnetohydrodynamics Coal-Fired Flow Facility
The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, April 1, 1992--June 30, 1992
Technical Report
·
Thu Feb 28 23:00:00 EST 1991
·
OSTI ID:5885983
The Magnetohydrodynamics Coal-Fired Flow Facility
Technical Report
·
Wed Oct 31 23:00:00 EST 1990
·
OSTI ID:6341629
The magnetohydrodynamics Coal-Fired Flow Facility. Technical progress report, April 1, 1992--June 30, 1992
Technical Report
·
Sun Jan 31 23:00:00 EST 1993
·
OSTI ID:10130126
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
BOTTOMING CYCLES
COAL-FIRED MHD GENERATORS
COMBINED-CYCLE POWER PLANTS
CONTROL
DIRECT ENERGY CONVERTERS
DOCUMENT TYPES
ENVIRONMENT
FLUID MECHANICS
FOSSIL-FUEL POWER PLANTS
HYDRODYNAMICS
MAGNETOHYDRODYNAMICS
MAINTENANCE
MECHANICS
MHD GENERATOR CFFF
MHD GENERATORS
MONITORING
PERFORMANCE
POLLUTION CONTROL
POWER PLANTS
PROGRESS REPORT
SUPERHEATERS
TESTING
THERMAL POWER PLANTS
THERMODYNAMIC CYCLES
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
200202 -- Fossil-Fueled Power Plants-- Waste Management-- Noxious Gas & Particulate Emissions
BOTTOMING CYCLES
COAL-FIRED MHD GENERATORS
COMBINED-CYCLE POWER PLANTS
CONTROL
DIRECT ENERGY CONVERTERS
DOCUMENT TYPES
ENVIRONMENT
FLUID MECHANICS
FOSSIL-FUEL POWER PLANTS
HYDRODYNAMICS
MAGNETOHYDRODYNAMICS
MAINTENANCE
MECHANICS
MHD GENERATOR CFFF
MHD GENERATORS
MONITORING
PERFORMANCE
POLLUTION CONTROL
POWER PLANTS
PROGRESS REPORT
SUPERHEATERS
TESTING
THERMAL POWER PLANTS
THERMODYNAMIC CYCLES