Pipeline-gas Demonstration Plant. Phase I: Demonstration Plant engineering and design. Volume 19: Plant Section 3000 - Flare
Technical Report
·
OSTI ID:6177893
Contract No. EF-77-C-01-2542 between Conoco Inc. and the US Department of Energy provides for the design, construction, and operation of a demonstration plant capable of processing bituminous caking coals into clean pipeline quality gas. The project is currently in the design phase (Phase I). This phase is scheduled to be completed in June 1981. One of the major efforts of Phase I is the process and project engineering design of the Demonstration Plant. The design has been completed and is being reported in 24 volumes. This is Volume 19 which reports the design of Plant Section 3000 - Flare. The purpose of the flare is to burn combustible streams that are vented from equipment during emergency, start-up, or other abnormal situations. The Demonstration Plant is equipped with one flare. There are two flare header systems in the plant; the high pressure header and the low pressure header. Each header is continually purged with nitrogen to prevent the accumulation of combustible mixtures. Relief valve discharges flow through the header to a knockout drum where entrained liquids are separated and recovered. Vapors flow up the flare stack and are combusted at the flare tip. Fuel gas is continually sent to the flare tip to maintain a pilot light. Steam and air injected into the tip provide smokeless operation.
- Research Organization:
- Conoco, Inc., Stamford, CT (USA); Foster Wheeler Energy Corp., Livingston, NJ (USA)
- DOE Contract Number:
- AC01-77ET13060
- OSTI ID:
- 6177893
- Report Number(s):
- DOE/ET/13060-T3(Vol.19); FE-2542-38(Vol.19); ON: DE81028343
- Country of Publication:
- United States
- Language:
- English
Similar Records
Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design
Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design
Demonstration plant engineering and design. Phase I. Pipeline-gas demonstration plant. Volume 24, Book 3. Job specifications
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6376047
Phase I: the pipeline-gas demonstration plant. Demonstration plant engineering and design
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6327874
Demonstration plant engineering and design. Phase I. Pipeline-gas demonstration plant. Volume 24, Book 3. Job specifications
Technical Report
·
Wed Dec 31 23:00:00 EST 1980
·
OSTI ID:6376031
Related Subjects
01 COAL, LIGNITE, AND PEAT
010404* -- Coal
Lignite
& Peat-- Gasification
010800 -- Coal
Lignite
& Peat-- Waste Management
AIR POLLUTION CONTROL
CHEMICAL REACTIONS
COAL GASIFICATION
COMBUSTION
CONTROL
CRG PROCESSES
DEMONSTRATION PLANTS
DIAGRAMS
ENGINEERING
GASEOUS WASTES
GASIFICATION
IGNITION
LURGI SLAGGING PROCESS
OXIDATION
POLLUTION CONTROL
SAFETY ENGINEERING
THERMOCHEMICAL PROCESSES
WASTES
010404* -- Coal
Lignite
& Peat-- Gasification
010800 -- Coal
Lignite
& Peat-- Waste Management
AIR POLLUTION CONTROL
CHEMICAL REACTIONS
COAL GASIFICATION
COMBUSTION
CONTROL
CRG PROCESSES
DEMONSTRATION PLANTS
DIAGRAMS
ENGINEERING
GASEOUS WASTES
GASIFICATION
IGNITION
LURGI SLAGGING PROCESS
OXIDATION
POLLUTION CONTROL
SAFETY ENGINEERING
THERMOCHEMICAL PROCESSES
WASTES