ISAPS: Intelligent Scheduling And Planning System
Conference
·
OSTI ID:6167586
- Allied-Signal Aerospace Co., Kansas City, MO (USA). Kansas City Div.
- Intellicorp, Mountain View, CA (USA)
ISAPS is a scheduling and planning tool for shop floor personnel working in a Flexible Manufacturing System (FMS) environment. The ISAP system has two integrated components: the Predictive Scheduler (PS) and the Reactive Scheduler (RS). These components work cooperatively to satisfy the four goals of the ISAP system, which are: (G1) meet production due dates, (G2) maximize machining center utilization, (G3) minimize cutting tool migration, and (G4) minimize product flow time. The PS is used to establish schedules for new production requirements. The RS is used to adjust the schedules produced by the PS for unforeseen events that occur during production operations. The PS and RS subsystems have been developed using IntelliCorp's Knowledge Engineering Environment (KEE), an expert system development shell, and Common LISP. Software Quality Assurance (SQA) techniques have been incorporated throughout the development effort to assure the ISAP system meets the manufacturing goals and end user requirements. 5 refs., 4 figs.
- Research Organization:
- Allied-Signal Aerospace Co., Kansas City, MO (USA). Kansas City Div.
- Sponsoring Organization:
- DOE/DP
- DOE Contract Number:
- AC04-76DP00613
- OSTI ID:
- 6167586
- Report Number(s):
- KCP-613-4336; CONF-910232--3; ON: DE91005254
- Country of Publication:
- United States
- Language:
- English
Similar Records
New Subgrouping of Multiple Stellar Populations in NGC 2808 Based on Low-resolution Spectroscopy
Integrated Flexible Manufacturing Program for manufacturing automation and rapid prototyping
Integrated Flexible Manufacturing Program for manufacturing automation and rapid prototyping
Journal Article
·
Fri Oct 01 00:00:00 EDT 2021
· The Astronomical Journal (Online)
·
OSTI ID:23159359
Integrated Flexible Manufacturing Program for manufacturing automation and rapid prototyping
Conference
·
Mon Nov 30 23:00:00 EST 1992
·
OSTI ID:10126997
Integrated Flexible Manufacturing Program for manufacturing automation and rapid prototyping
Conference
·
Mon Nov 30 23:00:00 EST 1992
·
OSTI ID:6863079