Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Preliminary design study of underground pumped hydro and compressed-air energy storage in hard rock. Volume 12. Plant design: CAES. Final report

Technical Report ·
OSTI ID:6164898
During Task 5C of the PEPCO/CAES study detailed designs were developed for the major components and systems of the CAES plant. These designs were based upon the preliminary economic and technical evaluations and alternative designs developed in Task 3C. Volume 12, Plant Design - CAES, presents the detailed project design drawings for the major plant systems and structures. In addition, Volume 12 presents the site development report, updated cost estimate, cost/schedule risk study, reliability/availability analysis, and recommendations for additional research and development.
Research Organization:
Potomac Electric Power Co., Washington, DC (USA); Acres American, Inc., Columbia, MD
DOE Contract Number:
AC02-77ET28013
OSTI ID:
6164898
Report Number(s):
EPRI-EM-1589-Vol.12; ON: DE81028110
Country of Publication:
United States
Language:
English