Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Dynamically positioned Derrick Barge and position measuring equipment for Lena guyed tower installation

Conference · · Proc., Annu. Offshore Technol. Conf.; (United States)
OSTI ID:6162265

A dynamic positioning (DP) system was installed on Brown and Root's derrick barge Atlas I and successfully used during the Lena guyed tower guying system installation. Modular design and onshore testing of the components resulted in rapid DP system installation and commissioning. Only minor DP equipment problems were experienced throughout the guying system installation. A long-baseline acoustic positioning system was used to measure the positions of the anchor piles, clump weights, and jacket during the Lena installation. The system provided relative position measurement accuracies on the order of + or - 5 feet in 1000 feet of water.

Research Organization:
Exxon Co.
OSTI ID:
6162265
Report Number(s):
CONF-8405208-
Journal Information:
Proc., Annu. Offshore Technol. Conf.; (United States), Journal Name: Proc., Annu. Offshore Technol. Conf.; (United States) Vol. 1; ISSN OSTCB
Country of Publication:
United States
Language:
English

Similar Records

Jacket, deck, and pipeline installation Lena guyed tower
Conference · Tue May 01 00:00:00 EDT 1984 · Proc., Annu. Offshore Technol. Conf.; (United States) · OSTI ID:6371484

Installation of guying system-Lena guyed tower
Conference · Tue May 01 00:00:00 EDT 1984 · Proc., Annu. Offshore Technol. Conf.; (United States) · OSTI ID:6418077

Design of the Lena guyed tower
Conference · Tue May 01 00:00:00 EDT 1984 · Proc., Annu. Offshore Technol. Conf.; (United States) · OSTI ID:6454219