Heber Geothermal Binary Demonstration Project. Quarterly technical progress report, September 15, 1980-March 31, 1981

Technical Report ·
DOI:https://doi.org/10.2172/6149061· OSTI ID:6149061
Work completed on the nominal 65 Megawatt (Mwe gross) Heber Geothermal Binary Demonstration Project, located at Heber, California, during the period of September 15, 1980, through March 31, 1981 is documented. Topics covered in this quarterly report include progress made in the areas of Wells and Fluids Production and Injection Systems, Power Plant Design and Construction, Power Plant Demonstration, and Data Acquisition and Dissemination.
Research Organization:
San Diego Gas and Electric Co., CA (USA)
DOE Contract Number:
FC03-80RA50239
OSTI ID:
6149061
Report Number(s):
DOE/RA/50239-1; ON: DE81027446
Country of Publication:
United States
Language:
English