Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Raising the acceptance of the AP2-line

Technical Report ·
DOI:https://doi.org/10.2172/6104892· OSTI ID:6104892
The 120 GeV Main Ring proton beam collides with the target at the end of the AP-1 line and creates antiprotons and other secondary particles. The AP-2 line transfers the negative particles from the target to the Debuncher. To provide a bigger antiproton stack size in the Accumulator, both the Debuncher as well as the AP-2 line acceptance have to be raised. This is a proposal for the improvement of the AP-2 line acceptance. The first part of the memo presents an acceptance examination of the existing AP-2 line by computer simulation, while the second presents a short proposal for aperture corrections. The computer program TURTLE was used to trace antiprotons through the AP-2 line without taking into account other negative charged particles. Betatron functions were obtained from the output of the SYNCH computer program. The SYNCH program was also used to check the dispersion match between the AP-2 line and the Debuncher. 3 refs., 6 figs., 5 tabs.
Research Organization:
Fermi National Accelerator Lab., Batavia, IL (USA)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
6104892
Report Number(s):
FNAL-TM-1589; ON: DE89013725
Country of Publication:
United States
Language:
English