AP2 and Debuncher Acceptance Upgrades
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
One exceedingly difficult problem that must be overcome in the accumulation of antiprotons is that of gathering the antiproton beam, which has been created in a very large phase space volume at the production target, into the relatively small admittance of the accelerator responsible for accumulation. Any endeavor to increase the yield of antiprotons will require either an increase in the overall acceptance of the Antiproton Source or improvements in the means by which a large reduction in the phase space volume occupied by the $$\overline{p}$$ beam is accomplished. The focus of this document is on the plans to increase the acceptance of Antiproton Source components immediately downstream of the production target – the AP2 beamline and the Debuncher ring.
- Research Organization:
- Fermi National Accelerator Laboratory (FNAL), Batavia, IL (United States)
- Sponsoring Organization:
- USDOE Office of Science (SC), High Energy Physics (HEP)
- DOE Contract Number:
- AC02-07CH11359
- OSTI ID:
- 1985139
- Report Number(s):
- FERMILAB-PBAR-NOTE--680; oai:inspirehep.net:864185
- Country of Publication:
- United States
- Language:
- English
Similar Records
Linear Antiproton Debuncher
Studies to Increase the Anti-Proton Transmission from the Targetto the Debuncher Ring
Raising the acceptance of the AP2-line
Technical Report
·
Mon Aug 17 00:00:00 EDT 1981
·
OSTI ID:1973954
Studies to Increase the Anti-Proton Transmission from the Targetto the Debuncher Ring
Conference
·
Wed May 11 00:00:00 EDT 2005
·
OSTI ID:886051
Raising the acceptance of the AP2-line
Technical Report
·
Wed Apr 05 00:00:00 EDT 1989
·
OSTI ID:6104892