Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

High-temperature-turbine technology program: Phase II. Technology test and support studies. Technical progress report, July 1, 1979-September 30, 1979

Technical Report ·
OSTI ID:6098330
This Quarterly Technical Progress Report summarizes the work performed by Curtiss-Wright on the Phase II - High Temperature Turbine Technology (HTTT) Program during the period from 1 July 1979 through 30 September 1979. Emphasized are the technical results achieved, the tecnical problems encountered, and requirements for corrective action where necessary. Technical activity and progress during the period are reported on by major Development Program Test Elements. These are: transpiration air cooled (TAC) fuel contaminant tolerance tests; combustor development tests with distillate fuel (FP-5) and synthesized low Btu gas (LBG); TAC stator cascade tests using distillate fuel and synthesized low Btu gas (LBG); turbine spool technology rig (TSTR) tests with (JP-5 fuel); analytical support studies; and materials and process studies.
Research Organization:
Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
DOE Contract Number:
AC01-76ET10348
OSTI ID:
6098330
Report Number(s):
CW-WR-76-020.58A; FE-2291-58A; ON: DE81027021
Country of Publication:
United States
Language:
English