High-temperature-turbine technology program: Phase II. Technology test and support studies. Technical progress report, April 1-June 30, 1980
Technical Report
·
OSTI ID:6098326
Work performed on the High Temperature Turbine Technology Program, Phase II - Technology Test and Support Studies during the period from April 1, 1980 through June 30, 1980 is summarized. Objectives of the program elements as well as technical progress and problems during this Phase II Quarterly Reporting Period are presented. The final 300 h of test of the LP rig engine with hot gas stream particulates, simulating operation on low Btu gas is described. The preparation of the distillate fuel test facility and the low Btu gas synthesizing facility for the TSTR stator vane cascade testing is presented along with the shakedown test of the distillate fuel stator vane cascade. Modifications to the distillate fueled 60/sup 0/ combustor sector rig to improve cooling and durability are described along with subsequent tests to evaluate the effectiveness of the modifications. The final checkout of the LBG fuel synthesis facility is presented and the initial combustor ignition and stability tests using synthesized LBG fuel are discussed. Fabrication of Turbine Spool Technology Rig components and the completed assembly of the TSTR test vehicle are discussed along with the preparation of the test facility. Supporting materials and process investigations are described. The single spool reference turbine subsystem aerodynamic evaluations and design of the combustor are presented and discussed.
- Research Organization:
- Curtiss-Wright Corp., Wood-Ridge, NJ (USA). Power Systems Div.
- DOE Contract Number:
- AC01-76ET10348
- OSTI ID:
- 6098326
- Report Number(s):
- CW-WR-76-020.64A; FE-2291-64A; ON: DE82000528
- Country of Publication:
- United States
- Language:
- English
Similar Records
High Temperature Turbine Technology Program: Phase II. Technology test and support studies. Technical progress report, July 1-September 30, 1980
High-temperature-turbine technology program: Phase II. Technology test and support studies. Technical progress report, July 1, 1979-September 30, 1979
High temperature turbine technology program. Phase II. Technology test and support studies. Annual technical progress report, January 1, 1979-December 31, 1979
Technical Report
·
Wed Oct 01 00:00:00 EDT 1980
·
OSTI ID:5563561
High-temperature-turbine technology program: Phase II. Technology test and support studies. Technical progress report, July 1, 1979-September 30, 1979
Technical Report
·
Mon Oct 01 00:00:00 EDT 1979
·
OSTI ID:6098330
High temperature turbine technology program. Phase II. Technology test and support studies. Annual technical progress report, January 1, 1979-December 31, 1979
Technical Report
·
Mon Dec 31 23:00:00 EST 1979
·
OSTI ID:6635469
Related Subjects
20 FOSSIL-FUELED POWER PLANTS
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
COMBUSTORS
DESIGN
FABRICATION
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASES
GASIFICATION
LOW BTU GAS
MACHINERY
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE
200102* -- Fossil-Fueled Power Plants-- Power Cycles
200104 -- Fossil-Fueled Power Plants-- Components
COAL GASIFICATION
COMBINED-CYCLE POWER PLANTS
COMBUSTORS
DESIGN
FABRICATION
FLUIDS
FUEL GAS
FUELS
GAS FUELS
GAS TURBINES
GASES
GASIFICATION
LOW BTU GAS
MACHINERY
PERFORMANCE TESTING
POWER PLANTS
RESEARCH PROGRAMS
TEST FACILITIES
TESTING
THERMAL POWER PLANTS
THERMOCHEMICAL PROCESSES
TURBINES
TURBOMACHINERY
VERY HIGH TEMPERATURE