Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Cost projection for a superconducting linac structure

Conference ·
OSTI ID:6083171
The increase of energy of the present 800 MeV proton linac at LAMPF to 1.6 to 2.2 GeV is of primary importance for the proposed future experimental program of this Laboratory. Layout and cost studies have been performed for (a) normalconducting and (b) superconducting accelerating structures. A more recent cost analysis for a superconducting structure is given in this report. 4 figs., 2 tabs.
Research Organization:
Los Alamos National Lab., NM (USA)
DOE Contract Number:
W-7405-ENG-36
OSTI ID:
6083171
Report Number(s):
LA-UR-89-1903; CONF-890299-12; ON: DE89014029
Country of Publication:
United States
Language:
English