Cost projection for a superconducting linac structure
Conference
·
OSTI ID:6083171
The increase of energy of the present 800 MeV proton linac at LAMPF to 1.6 to 2.2 GeV is of primary importance for the proposed future experimental program of this Laboratory. Layout and cost studies have been performed for (a) normalconducting and (b) superconducting accelerating structures. A more recent cost analysis for a superconducting structure is given in this report. 4 figs., 2 tabs.
- Research Organization:
- Los Alamos National Lab., NM (USA)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 6083171
- Report Number(s):
- LA-UR-89-1903; CONF-890299-12; ON: DE89014029
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cost of a normalconducting linac structure
New results on (LAMPF II) superconducting linac cost
Design study for a superconducting proton linac from 20 to 100 MeV
Conference
·
Sat Dec 31 23:00:00 EST 1988
·
OSTI ID:6087464
New results on (LAMPF II) superconducting linac cost
Conference
·
Sat Dec 31 23:00:00 EST 1988
·
OSTI ID:5357171
Design study for a superconducting proton linac from 20 to 100 MeV
Conference
·
Thu Jul 01 00:00:00 EDT 1993
·
OSTI ID:10167055
Related Subjects
43 PARTICLE ACCELERATORS
430100* -- Particle Accelerators-- Design
Development
& Operation
ACCELERATORS
CAVITY RESONATORS
CONTROL EQUIPMENT
COST
CRYOSTATS
DESIGN
ELECTRONIC EQUIPMENT
EQUIPMENT
LAMPF LINAC
LINEAR ACCELERATORS
MESON FACTORIES
RESONATORS
SUPERCONDUCTING CAVITY RESONATORS
SUPERCONDUCTING DEVICES
THERMOSTATS
430100* -- Particle Accelerators-- Design
Development
& Operation
ACCELERATORS
CAVITY RESONATORS
CONTROL EQUIPMENT
COST
CRYOSTATS
DESIGN
ELECTRONIC EQUIPMENT
EQUIPMENT
LAMPF LINAC
LINEAR ACCELERATORS
MESON FACTORIES
RESONATORS
SUPERCONDUCTING CAVITY RESONATORS
SUPERCONDUCTING DEVICES
THERMOSTATS