New results on (LAMPF II) superconducting linac cost
Conference
·
OSTI ID:5357171
A consolidated cost estimate for a superconducting 800 MeV extension of the LAMPF I linac is presented in this note. Based on recent CERN-LEP tender results for 20 superconducting cavities, the cost of a superconducting linac structure (402.5 MHz) can be projected with much better accuracy than so far. The total construction cost for an 800 MeV extension amounts to 99.5 M$, buildings, cryoplant etc. included. The corresponding figure for a normal conducting structure (1207.5 MHz, on axis coupled) is 104.6 M$.
- Research Organization:
- Los Alamos National Lab., NM (USA)
- Sponsoring Organization:
- DOE/ER
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 5357171
- Report Number(s):
- LA-UR-89-3713; CONF-8910306--1; ON: DE90003167
- Country of Publication:
- United States
- Language:
- English
Similar Records
Cost projection for a superconducting linac structure
Possible applications of superconducting rf at LAMPF
Design study for a superconducting proton linac from 20 to 100 MeV
Conference
·
Sat Dec 31 23:00:00 EST 1988
·
OSTI ID:6083171
Possible applications of superconducting rf at LAMPF
Conference
·
Mon Nov 30 23:00:00 EST 1987
· AIP Conf. Proc.; (United States)
·
OSTI ID:5524425
Design study for a superconducting proton linac from 20 to 100 MeV
Conference
·
Thu Jul 01 00:00:00 EDT 1993
·
OSTI ID:10167055
Related Subjects
43 PARTICLE ACCELERATORS
430100* -- Particle Accelerators-- Design
Development
& Operation
ACCELERATORS
CAPITALIZED COST
CAVITY RESONATORS
COST
COST ESTIMATION
ELECTRONIC EQUIPMENT
EQUIPMENT
LAMPF LINAC
LINEAR ACCELERATORS
MESON FACTORIES
RESONATORS
SUPERCONDUCTING CAVITY RESONATORS
SUPERCONDUCTING DEVICES
430100* -- Particle Accelerators-- Design
Development
& Operation
ACCELERATORS
CAPITALIZED COST
CAVITY RESONATORS
COST
COST ESTIMATION
ELECTRONIC EQUIPMENT
EQUIPMENT
LAMPF LINAC
LINEAR ACCELERATORS
MESON FACTORIES
RESONATORS
SUPERCONDUCTING CAVITY RESONATORS
SUPERCONDUCTING DEVICES