Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Waste handling and packaging plant project description

Conference ·
OSTI ID:6017292

ORNL currently has about 300 m{sup 3} of remote handled transuranic (RHTRU) solid waste retrievably stored in trenches and a bunker. This material will be processed through the Waste Handling and Packaging Plant (WHDP) for shipment to the Waste Isolation Pilot Plant (WIPP). Details of siting, construction, and conceptual flow of RHTRU waste through the plant are provided. ORNL also has liquid waste and sludge stored in the Melton Valley Storage Tanks (MVST). The sludge also contains TRU waste, and the WHPP will process an expected volume of 500,000 gallons of a suernatant/sludge slurry for shipment to the WIPP. Specific systems which require more development include the cask transfer system, the linear accelerator-based nondestructive assay and nondestructive evaluation equipment. (MHB)

Research Organization:
Oak Ridge National Lab., TN (USA)
Sponsoring Organization:
DOE/DP
DOE Contract Number:
AC05-84OR21400
OSTI ID:
6017292
Report Number(s):
CONF-910270-17; ON: DE91008368
Country of Publication:
United States
Language:
English