Design and construction of the EBT-P development coils

Conference ·
OSTI ID:5991839
The ELMO Bumpy Torus Proof-of-Principle (EBT-P) plasma physics device is a large mirror fusion machine scheduled to begin operation in 1985. It will have 36 superconducting mirror magnets arranged in a bumpy torus on a 4.5 m radius. Presented here are several of the design parameters and supporting design/analysis that have not been published until now due to contractural arrangements between ORNL and the EBT-P subcontractors.