10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 1 of 26: site development and preliminary earthwork construction package 1 (RADL 7-8)
Technical Report
·
OSTI ID:5990816
The civil calculations presented include the drainage, roads, pavement, basecourse, and earthfill design of the Barstow Solar Pilot Plant. (BCS)
- Research Organization:
- Stearns-Roger Engineering Corp., Denver, CO (USA)
- DOE Contract Number:
- AC03-79SF10499
- OSTI ID:
- 5990816
- Report Number(s):
- DOE/SF/10499-T91; STMPO-176; SAN-0499-50-Bk.1; MDC-G-8502-Bk.1; ON: DE86001382
- Country of Publication:
- United States
- Language:
- English
Similar Records
10 MWe Solar Thermal Central Receiver Pilot Plant. Site Development and Preliminary Earthwork - Construction Package No. 1
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 2 of 26. Warehouse, construction package 3 (RADL Item 7-8)
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 3 of 26. Structural steel and buildings construction package 5 (RADL 7-8)
Technical Report
·
Wed Jun 13 00:00:00 EDT 1979
·
OSTI ID:5169616
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 2 of 26. Warehouse, construction package 3 (RADL Item 7-8)
Technical Report
·
Mon Sep 01 00:00:00 EDT 1980
·
OSTI ID:6499628
10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 3 of 26. Structural steel and buildings construction package 5 (RADL 7-8)
Technical Report
·
Mon Sep 01 00:00:00 EDT 1980
·
OSTI ID:5990814