Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe Solar Thermal Central Receiver Pilot Plant: solar facilities design integration. PSS final design calculations. Book 2 of 26. Warehouse, construction package 3 (RADL Item 7-8)

Technical Report ·
OSTI ID:6499628
This document is provided in support of the warehouse construction at the Barstow Solar Pilot Plant. The calculations include the interrupting rating (short circuit study), lighting, and foundation design for the prefabricated metal building. (BCS)
Research Organization:
Stearns-Roger Engineering Corp., Denver, CO (USA)
DOE Contract Number:
AC03-79SF10499
OSTI ID:
6499628
Report Number(s):
DOE/SF/10499-T92; STMPO-177; SAN-0499-Bk.2; MDC-G-8502-Bk.2; ON: DE86001383
Country of Publication:
United States
Language:
English