10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual
Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repair description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)
- Research Organization:
- Martin Marietta Corp., Denver, CO (USA)
- DOE Contract Number:
- AC03-79ET21007
- OSTI ID:
- 5951081
- Report Number(s):
- DOE/ET/21007-T6; ON: DE81029410
- Country of Publication:
- United States
- Language:
- English
Similar Records
10 MWe solar thermal central receiver pilot plant. Preliminary design review package
10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning
10 MWe solar thermal central receiver pilot plant. Phase II, planning
Technical Report
·
Mon Nov 27 23:00:00 EST 1978
·
OSTI ID:6838718
10-MWe solar-thermal central-receiver pilot plant. Phase II. Planning
Technical Report
·
Wed Aug 01 00:00:00 EDT 1979
·
OSTI ID:5837465
10 MWe solar thermal central receiver pilot plant. Phase II, planning
Technical Report
·
Wed Aug 01 00:00:00 EDT 1979
·
OSTI ID:7175968
Related Subjects
14 SOLAR ENERGY
140702* -- Solar Thermal Power Systems-- Central Receiver
BARSTOW SOLAR PILOT PLANT
COMPUTERIZED CONTROL SYSTEMS
CONTROL SYSTEMS
EQUIPMENT
FUNCTIONAL MODELS
HAZARDS
HELIOSTATS
MAINTENANCE
OPERATION
PILOT PLANTS
POWER PLANTS
REPAIR
SAFETY
SOLAR EQUIPMENT
SOLAR POWER PLANTS
SOLAR THERMAL POWER PLANTS
THERMAL POWER PLANTS
TOWER FOCUS POWER PLANTS
140702* -- Solar Thermal Power Systems-- Central Receiver
BARSTOW SOLAR PILOT PLANT
COMPUTERIZED CONTROL SYSTEMS
CONTROL SYSTEMS
EQUIPMENT
FUNCTIONAL MODELS
HAZARDS
HELIOSTATS
MAINTENANCE
OPERATION
PILOT PLANTS
POWER PLANTS
REPAIR
SAFETY
SOLAR EQUIPMENT
SOLAR POWER PLANTS
SOLAR THERMAL POWER PLANTS
THERMAL POWER PLANTS
TOWER FOCUS POWER PLANTS