Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

10 MWe solar thermal central receiver pilot plant. Preliminary design review package

Technical Report ·
OSTI ID:6838718
This preliminary design review package includes: structures and mechanics; mirror assembly; heliostat pointing and alignment; heliostat coordinate definitions; field electrical power; control system requirements; HAC configuration; HC/HFC packaging; electrical cabling; phase I test program; manufacturing and tooling; and systems.
Research Organization:
Martin Marietta Aerospace, Denver, CO (USA)
DOE Contract Number:
AC03-79ET21007
OSTI ID:
6838718
Report Number(s):
DOE/ET/21007-2; STMPO-284; MCR-78-1330; ON: DE84011218
Country of Publication:
United States
Language:
English