Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Overcoring and calibration of IRAD GAGE stressmeters at the Spent Fuel Test in Climax granite

Technical Report ·
DOI:https://doi.org/10.2172/59333· OSTI ID:59333

IRAD GAGE vibrating-wire stressmeters were installed in the Spent Fuel Facility at the Nevada Test Site to measure the change in in-situ stress during the Spent Fuel Test-Climax (SFT-C). Although extensive pre-installation laboratory tests were conducted, they were generic in nature. Unfortunately the degree of gage-rock contact has a strong influence on gage sensitivity and cannot be predicted before installation. This report discusses the results of removing a cylindrical section of rock and gages as a unit through overcoring and the subsequent post test calibrations of the stressmeters in the laboratory. With the assumption that the gage-rock contact was not disturbed by the overcoring, the results from these calibrations compensate for varying gage-rock contact. The estimated in-situ stresses based on post test calibration data are quite consistent with those directly measured in nearby holes. The magnitude of stress change calculated from pre-installation test data is generally much smaller than that estimated from post test calibration data.

Research Organization:
Lawrence Livermore National Lab., CA (United States)
DOE Contract Number:
W-7405-ENG-48
OSTI ID:
59333
Report Number(s):
UCID--20318; ON: DE85005785
Country of Publication:
United States
Language:
English