Stressmeter placement at spent fuel test in climax granite
Vibrating wire stressmeters were installed in the Spent Fuel Facility at the Nevada Test Site. These stressmeters will measure the changes in in situ stress during the five-year spent fuel test. Before installation, laboratory tests were conducted to study reproducibility of placement and to develop a program hopefully to reduce corrosion of the stressmeters while in place at the Spent Fuel Facility. These laboratory tests are discussed along with the installation of the stressmeters at the Spent Fuel Facility.
- Research Organization:
- California Univ., Livermore, CA (United States). Lawrence Livermore Lab.
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 59211
- Report Number(s):
- UCID--18629
- Country of Publication:
- United States
- Language:
- English
Similar Records
Overcoring and calibration of IRAD GAGE stressmeters at the Spent Fuel Test in Climax granite
New approach for calibration and interpretation of IRAD GAGE vibrating-wire stressmeters
Instrumentation Report No. 2: identification, evaluation, and remedial actions related to transducer failures at the spent fuel test-climax
Technical Report
·
Sat Sep 15 00:00:00 EDT 1984
·
OSTI ID:59333
New approach for calibration and interpretation of IRAD GAGE vibrating-wire stressmeters
Technical Report
·
Thu May 01 00:00:00 EDT 1986
·
OSTI ID:59917
Instrumentation Report No. 2: identification, evaluation, and remedial actions related to transducer failures at the spent fuel test-climax
Technical Report
·
Sun Nov 29 23:00:00 EST 1981
·
OSTI ID:59237