Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling.

Technical Report ·
DOI:https://doi.org/10.2172/591110· OSTI ID:591110
A total of 18 wells, 14 producers and 4 injection wells, were drilled and completed during the Field Demonstration portion of the project. These 18 wells are all currently in service, with the producing wells going on-line between May and September 1996, and the injection wells going into service between August and December 1996. Current Unit production is approximately 3,100 BOPD, of which approximately 800 BOPD is being contributed from the 14 Project 10-acre producing wells (Figure 1). A revision in the Statement of Work was approved to allow for the drilling of additional 10-acre infill wells or injection well conversions as budget constraints allow.
Research Organization:
Fina Oil and Chemical Co., Midland, TX (United States). Western Div.
Sponsoring Organization:
USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
DOE Contract Number:
FC22-94BC14989
OSTI ID:
591110
Report Number(s):
DOE/BC/14989--T1; ON: DE98051645
Country of Publication:
United States
Language:
English