Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly technical progress report, September 13--December 12, 1996
Eighteen 10-acre infill wells have been drilled and completed as part of the Field Demonstration phase of the project at the North Robertson (Clearfork) Unit (NRU). The fourteen producing wells are pumped-off and producing at stable rates. The four injection wells are completed and have been on injection for three to four weeks. Current Unit production is approximately 3,400 STBO/D, of which approximately 900 STBO/D is being produced from the 10-acre infill wells. A change in the Statement of Work has been approved so that additional 10-acre infill wells can be drilled and/or 20-acre producing wells can be converted to injection during the next quarter as budget constraints and rig availability allow. Technical progress is described for the quarter in many related areas: implementation of the field demonstration; reservoir characterization; reservoir management activities and performance analysis; reservoir simulation; and technology transfer.
- Research Organization:
- Fina Oil and Chemical Co., Midland, TX (United States)
- Sponsoring Organization:
- USDOE Assistant Secretary for Fossil Energy, Washington, DC (United States)
- DOE Contract Number:
- FC22-94BC14989
- OSTI ID:
- 463572
- Report Number(s):
- DOE/BC/14989--13; ON: DE97003912
- Country of Publication:
- United States
- Language:
- English
Similar Records
Application of integrated reservoir management and reservoir characterization to optimize infill drilling. Quarterly progress report, June 13, 1996--September 12, 1996
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling.
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling
Technical Report
·
Thu Sep 12 00:00:00 EDT 1996
·
OSTI ID:459907
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling.
Technical Report
·
Wed Jan 14 23:00:00 EST 1998
·
OSTI ID:591110
Application of Integrated Reservoir Management and Reservoir Characterization to Optimize Infill Drilling
Technical Report
·
Tue Nov 02 23:00:00 EST 1999
·
OSTI ID:14181