Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Breeder: now or never. [Increased construction necessary for breeder development]

Conference · · Proc. Am. Power Conf.; (United States)
OSTI ID:5901143
The timing of the commercial introduction of the liquid metal fast breeder reactor (LMFBR) will be an important factor in its ability to supply a significant fraction of the nation's future electrical needs. The number of breeders we can build initially will be limited by the size of our low-cost uranium resources and by the rate at which light water reactors (LWRs) are placed in service. Since this uranium resource is fixed in size while electrical demand will grow geometrically, it is clear that the sooner the breeder is introduced commercially the larger will be the fraction of electrical demand it can supply. An early commercial introduction on an adequate scale requires full-scale resumption of LWR construction and redirection of LMFBR development programs toward a near-term commercial prototype.
Research Organization:
Electric Power Research Inst., Palo Alto, CA
OSTI ID:
5901143
Report Number(s):
CONF-780440-
Conference Information:
Journal Name: Proc. Am. Power Conf.; (United States) Journal Volume: 40
Country of Publication:
United States
Language:
English